QR codeQR code

Reconstruction of Herat-Kabul and Kabul-Salang highways starts

31 Jul 2022 - 9:33

Officials of the Ministry of Public Works say that they have started the reconstruction of Herat-Kabul and Kabul-Salang highways.


Afghan Voice Agency(AVA)_Monitoring, According to the officials, the cost of reconstruction of all these projects will be paid by the Ministry of Public Works.

“The Herat-Kabul highway is 900 km long, so we decided to start the reconstruction of this highway with the private sector,” said Hamidullah Misbah, a spokesman for the MoPW.

Meanwhile. the drivers and residents of the area welcome this action of the Islamic Emirate, saying that after this, the drivers should refrain from the heavy tonnage and extra weight vehicles that cause damage to the highway.

“Drivers should not load too much and load as much as the road standard,” said Khalilullah, a driver.
Kabul-Herat highway is 900 km long and 7 meters wide, but now the width of this highway has been increased to 10 meters to prevent traffic accidents.
 


Story Code: 256364

News Link :
https://www.avapress.com/en/news/256364/reconstruction-of-herat-kabul-and-salang-highways-starts

AVA
  https://www.avapress.com